Energy Integration
InferaStack AI Grid is designed to run AI work within the power each site makes available. The electricity grid stays the main supply; solar and batteries can add to it.
From site review to acceptance
- 1 · UnderstandReview the siteAgree the site's energy requirements, operating responsibilities and safety expectations.
- 2 · PlanAssess suitabilityConsider how AI compute could fit the site's energy resources and the owner's requirements.
- 3 · AgreeDefine the workloadSet the intended AI use, service expectations and acceptance criteria before deployment.
- 4 · ValidateMeasure the outcomeConfirm safe operation and workload performance through agreed testing and site acceptance.
Where the energy design stands
Energy integration partnerConnectVPP is the InferaStack AI Grid energy integration partner. The partnership supports the proposed energy-aware AI infrastructure for qualified sites. The design remains in technical validation and is not deployed.
| Part | Status |
|---|---|
| Energy integration | Proposed design in technical validation; not deployed. |
| Site suitability | Reviewed against each site's operating requirements before a deployment is agreed. |
| Operational performance | Site performance and energy outcomes have not yet been measured. |
| Batteries, inverters and monitoring | Technology categories under evaluation. No supply or deployment commitment is in place. Final hardware depends on site checks and measured results. |
Discuss an energy-aware site
Talk to us about site requirements, energy integration or validation.